Nicholas Maina

Phase 1: Key Activities undertaken in July 2025:

  • Design of pump water intake on a small stream at the clients farm.
  • Supply of construction material.
  • Supervision of construction.
  • Pump testing the completed intake to determine the optimum solar pump required.

Phase 2: Pending Works.

  • Design of solar pump and associated solar equipment
  • Installation of solar pump.
  • Installation of 500m water pipeline and storage tanks.